BETOGARD EP | Two-component paint and floor coating

BETOGARD EP | Two-component paint and floor coating

RBS-contech

BETOGARD EP | Two-component paint and floor coating


Applications

+ More


BETOGARD EP | Two-component paint and floor coating

BETOGARD EP | Two-component paint and floor coating

BETOGARG EP is a two-component product based on epoxy resins and solvent-free, for creating flooring and painting horizontal and vertical surfaces.

BETOGARD EP

Two-component paint and floor coating based on solvent-free epoxy, for floors and walls

 

 

Description:

BETOGARG EP is a two-component product based on epoxy resins and solvent-free, for creating flooring and painting horizontal and vertical surfaces.

 

 

Indications:

• Implementation on concrete and cement surfaces with mineral base

• Implementation of flooring in places with heavy and semi-heavy traffic such as factories, warehouses and loading areas

• Implementation of flooring in parking lots and power plants

• Implementation of flooring in health industries such as hospitals, pharmaceutical factories, laboratories and food industries

• Implementation of flooring in hotels, showrooms and repair shops

• Implementation of flooring in production halls

• Protective covering and sealing of concrete and metal tanks and ponds

• Painting walls and different surfaces in industrial environments

 

 

Advantages and features:

• High chemical and mechanical resistance

• Excellent adhesion to the substrate

• Solvent-free, safe implementation and use on interior surfaces

• Easy implementation

• Easy cleaning in hospitals, food industries and laboratories

 

Technical Specifications:

Component A : Epoxy Resin

Component B : Epoxy Hardener

White, Grey and other RAL color

≥2,5 N/mm2 (7 days) (on concrete and steel)

+10°C to +30°C

Highly resistant to formaldehyde (40%), sulfuric acid (50%), hydrochloric acid (50%), lactic acid (50%), nitric acid (100%), Sodium hydroxide (50%), wine, sea water, diesel fuel, aviation fuels , vegetable oils.

45 minutes

 

12 hours

7 days

3214.90.00.00.19

Content

 

Color

Adhesion Strength (EN 1542)

Application/Surface Temperature

Chemical Resistance

 

 

 

Pot Life

Drying Time

Initial curing

Full curing

HS Code

 

Method of Use:

Surface preparation: The surface must be free from all weak materials, dust, mold oil, paint, mud, etc. In general, the surface should be free of any material that prevents adhesion. It is better to use sub-concrete for more cleaning and removal of porous and weak points. Ceramic, porous concrete and cracks must be repaired with cement or epoxy based mortars before implementation. Before applying BETOGARG EP flooring, DEZOFLOOR 800 epoxy primer should be applied to the working surface.

 

 

Method of implementation:

First, the epoxy resin component A is mixed with a low speed mixer. Then, Hodner's epoxy part, part B, is added to it and mixing is continued with a low speed mixer for 3 to 4 minutes until a homogeneous and uniform mixture is obtained. The prepared mixture is applied using a roller or airless in two layers on the surface of the primed primer. The time between applying two layers should not exceed 24 hours. The prepared mixture should be consumed within 30 minutes at most. Final processing will be done within 7 days. The work surface must be protected from water and rain for 24 hours after the completion of the execution. The ambient and surface temperature during execution should be between 10 and 30 degrees Celsius. Do not apply flooring on rainy days and places exposed to wind.

 

 

Dosage:

0.400 to 0.600 kg per square meter will be used for each layer. The recommended thickness for implementation is 125 to 250 microns.

Packaging, duration and storage conditions:

• 5 kg set (part A: 4.35 kg gallon, B part: 0.65 kg gallon)

• 12 months in original packaging.

• Store in a dry environment at a temperature of 5 to 35 degrees Celsius. Protect from high heat and frost.

 

Equipment cleaning:

Used equipment and supplies should be washed with industrial solvents immediately after use. If the mortar dries on the cleaning equipment, it will be possible only by mechanical methods.

 

Warnings and limitations:

• Do not apply flooring in rainy and frosty weather.

• After the completion of the execution, until the final drying, the work surface should be protected from rain, moisture, traffic and traffic.

• Preventing heavy traffic within 24 hours from the end of the execution time

• When the temperature of the environment and the working surface is less than 10 degrees Celsius and more than 30 degrees Celsius, it is forbidden to perform floor covering.

 

 

Safety tips:

Avoid contact with eyes and skin and wash your hands after use. In case of contact with eyes, skin or swallowing, consult a doctor immediately or refer to the safety section of the data sheet. Close the lid of the container when not in use and keep it out of the reach of children.



How It Works